​​​Building the dream

PHASING of the construction and remodel plans will make the building fully operational and usable in Phase 1.  Future phases will require minimal remodel and change by the design and forethought of Phase One - minimizing overall costs. 
       
                        - Open space / Box theatre / Multi use space
                        - North Addition: Theatre set building / Storage
                        - Flexible Theatre & Stage setup
                        - Flexible seating / Chairs
                        - Remodeling existing building as required
                        - New HVAC system
                        - Electrical support systems
                        - Insulated and finished concrete floor        
                        - Insulated and finished exterior walls  
                        - Site improvements at front, at entry, and along creek

PHASE ONE